LIST PROJECTS UNDERTAKEN BY “SYROS COMMERCIAL DIVING”
02/01/13, F/B “ARTEMIS”…Cleaning of Sea Chests and Engine Water Intakes
05/01/13,F/B “ARTEMIS” … Inspection of Ship’s Replacement of Rudder & Post
06/01/13, SEKAVIN S.A. SYROS…Grouting Pipeline Supports with Concrete Bags.
17-19/01/13, SEKAVIN S.A. .. Grouting of Caving Spaces between Pipeline Supports
20/01/13, SEKAVIN S.A. Replacement of Cathodic Protection Anodes on all Fuel Oil Pipelines
04/03/13, ΔΕΥΑΣ (Syros Municipal Water Co.)…Seabed Inspection prior to the Installation of new Desalination Sea Water Pipelines.
08/04/13, ΔΕΥΑΣ… Filtration Screen Replacement on Desalination Pipeline Intakes.
14/04/13, NEORION SYROS…Ship Berthing on Shipyards Floating Dock
18/05/13, F/B “BLUE STAR 2” Propeller Clearing from Entangled Mooring Hawser.
22/04/13, F/B “HIGH SPEED 5” Inspection of Propulsion Jet Nozzles
22-25/05/13, SEKAVIN S.A. … Ramp Construction
07-09/12/13, SEKAVIN S.A….. Pipeline Measurements prior to their Replacement.
11-12/12/13, SEKAVIN S.A…… Replacement of Cathodic Protection Anodes
20-22/10/14, SEKAVIN S.A. ….Replacement of Subsea Power Line
12-14/12/14, ΔΕΥΑΣ… Replacement of Desalination Subsea Water Pumps
17-22/12/14, ΔΕΗ HYDROELECTRIC DAM, VEROIA. Installation of 3 U/W Multi-metering Sensors, for “TREE COMPANY CORPORATION A.E.B.E
04/01/15, NEORION SYROS…..Ship Berthing on Shipyards Floating Dock
06-08/01/15, ΔΕΗ HYDROELECTRIC DAM, KOZANH… Installation of 2 U/W Multi-metering Sensors
09-11/01/15, ΔΕΗ HYDROELECTRIC DAM, ARTA… Installation of 2 U/W Multi-metering Sensors
11-14/01/15, ΔΕΗ HYDROELECTRIC DAM, KARDITSA…Installation of 1 U/W Multi-metering Sensor
06/02/15, F/B “BLUE STAR PAROS” Propeller Clearing from Entangled Mooring Hawser
08/03/15, F/B “HIGH SPEED 4” Cleaning of Engine Cooling Water Intakes
21-23/06/15, ΔΕΗ, HYDROELECTRIC DAM, TRIPOLI… Installation of 1 U/W Multi-metering Sensor
19-20/11/15, SEKAVIN S.A…Replacement of Cathodic Protection Anodes
04-06/06/16, SYROS MUNICIPAL PORT FUND… Relocation of Mooring Buoys
23-25/06/16, SYROS MUNICIPAL PORT FUND…. Installation of New Mooring Buoys
01-02/08/16 T/R “LILA”,… Refloating of Sunken Touring Boat
18/09/16, F/B “ARTEMIS”, . Search & Recovery of Ship’s Lost Anchor
10-20/10/16, SEKAVIN S.A. Removal and Replacement of 5 Subsea Refueling Pipelines
24/10/16, SEKAVIN S.A. Inspection and Replacement of Cathodic Protection Anodes
08/02/18-02/03/18, “MARINET” Port Consultants. U/W Inspections and Video Surveys of All Berthing Facilities at the ports of ANDROS, TINOS and PAROS.
05/03/18, SYROS PORT AUTHORITIES, Hull Inspection of Coast Guard Patrol Boat.
22/04/18-16/05/18, “ONEX” SYROS SHIPYARDS. Participating in the Refloating Operation of the Sunken 75.000 ton capacity, F/D “VIOLANDO GOULANDRIS”
07-10/10/18, «ΤΖΟΓΑΝΗΣ, ΕΓΕΚΑ» Ο.Ε., Seabed Survey at KIMOLOS ISLAND, prior to the Installation of Desalination Pump Station.
30-31/10/18, ΔΕΥΑΣ, Inspection and Cutting of Damaged Bio-waste Line
20-22/11/18, ΔΕΥΑΣ, Restoration of Damaged Bio-waste Line.
04-07/12/2018, «ΤΖΟΓΑΝΗΣ, ΕΓΕΚΑ» Ο.Ε. Installation of Sea Water Desalination Pump Station at KIMOLOS ISLAND.
07-08/12/18, SYROS PORT AUTHORITIES. Search and Recovery of Ships Propeller Fragments from Seabed.
15-17/04/19, SYROS PORT AUTHORITIES. Removal and Reinstallation of Both Propellers on Coastguard Patrol Boat.
09/06/19, “ONEX” SYROS SHIPYARDS. Berthing of Λ.Σ.421 and H/S “ALKIONI” on Floating Dock.
25/06/19, F/B “BLUE STAR 1”. Search and Recovery of Ship’s Lost Anchor.
19-20/06/19, APPOINTED by the DISTRICT CURT OF SYROS as an Expert in their Investigation for the Sinking of the F/B “EXPRESS SAMINA”
18/09/20, M/V “EQUINOX”, Search and Recovery of Ship’s Chain and Anchor, Lost at Syros Outer Anchorage.
20-25/11/20, ΔΕΥΑΣ. Removal and Replacement of Desalination Submersible Pumps
26/11/20. M/V “CONCARAN. Cleaning the Ship’s Sea-chest and Sea Water Intakes and Polishing the Propeller. .